Rules that apply in every state
- Pumps above 7.5 HP can be installed, but subsidy is limited to the 7.5 HP cost (15 HP allowed in North-East and hill states).
- No new pumps where the groundwater block is classified as dark (over-exploited) unless the state allows micro-irrigation conditions.
- Component B is for farms without a grid connection (or replacing diesel). If you already have a grid pump, Component C solarisation is the route, and that one lets you sell surplus power to the DISCOM.
- Apply only on your state agency's portal. Nobody needs to be paid to "get a slot"; the farmer share is paid to the vendor or agency through the portal process.
Is a solar pump worth it?
A solar pump runs only in daylight and gives most water around midday, so it suits drip or a small storage tank better than flood irrigation of a large plot at night. It has no fuel or electricity bill, and panels carry long warranties, but check the vendor's 5-year maintenance obligation in your state's scheme before you pay your share.
Sources
- MNRE PM-KUSUM scheme page (validity shown as till 31.03.2026)
- MNRE Comprehensive PM-KUSUM Implementation Guidelines, 17 Jan 2024 (PDF)
- PIB: PM-KUSUM State/UT-wise progress as on 30.11.2025 (Lok Sabha USQ 1770, 10 Dec 2025), Annexure I
- PIB: PM-KUSUM benefits reach over 21.77 lakh farmers (Rajya Sabha, 24 Mar 2026)
- Down To Earth: Centre readies PM-KUSUM 2.0 (30 Dec 2025)
- Energetica India: MNRE extends PM-KUSUM completion to 31 Mar 2027 (30 Mar 2026)
- SolarQuarter: deadlines extended, transition to KUSUM 2.0 (6 Apr 2026)
- News digest (The Hindu via superprep): PM-KUSUM 2.0 with agrivoltaics, 14 Sep 2026
- PEDA PM-KUSUM page (states 1.0 closed 31.12.2025)